D4.5 – Report and guidelines on operational control strategies for injection in networks for the relevant cases and positioning of optimal monitoring points in the network September 15, 2026
Deliverable 3.2. Assessing the compatibility of the existing natural gas infrastructure with H2-NG blends August 26, 2026